| This management model is subdivided into four parts, depending on the type of waste, its destination and the type of collection. However, the first five steps are common to all four.
The producer or holder must:
1 Be on the Register of producers of industrial waste or have a waste producer code.
2 Characterise the waste, if necessary, through a laboratory certified for determining the characteristics of the waste.
3 Code their waste according to the European waste catalogue (CER).
4 Determine the most ideal destination and the characterisation according to the Catalonian waste catalogue (CRC). (The CRC still holds concerning the determination of management routes, and you will also find the best destination by consulting the European waste catalogue (CER) where the equivalencies have been made)
5 Seek an authorised waste manager that can give it this treatment.
6 The documentation to be used is the following:
MODEL C1) For all waste for the evaluation plants and the waste in annexe 2 intended for waste treatment and disposal plants delivered on individual transport. It is NOT necessary to establish an Acceptance sheet for the transport, it is possible to use one's own vehicle (not authorised) and, when delivering the waste to the waste manager, they will give the producer a waste reception certificate.
MODEL C2) For all waste intended for evaluation plants and the waste in annexe 2 intended for waste treatment and disposal plants, within the framework of itinerant collection. It is NOT necessary to establish an Acceptance sheet, the transport must be authorised and the Itinerant consignment note must be used.
MODEL C3) For all waste not included in annexe 2 intended for waste treatment and disposal plants, with individual transport, an Acceptance sheet must be established, for the transport it is possible to use one's own vehicle (not authorised) and when delivering the waste to the waste manager, they will give the producer a waste reception certificate.
MODEL C4) For waste not included in annexe 2 and intended for waste treatment and disposal plants within the framework of itinerant waste collection. An Acceptance sheet must be established, the transport must be authorised and the Itinerant consignment note must be used.
|